Selected from 640 delivered projects

Proof, not promises.

Every project below was delivered under a signed contract, audited at practical completion and still standing. Filter by sector to find something comparable to yours.

Projects
640
Value
$1.4B
On time
98.4%

Case study 01

Harborview Logistics Center

Industrial Design-build 2023–2025
Mass timber erection, week 34
Façade & rainscreen
Dock levellers, bay 40–60

The brief

Cascadia Grocers needed a 312,000 sq ft distribution centre delivered on a fixed site in a working port district — with a hard constraint that no more than six truck bays could be closed at any one time.

The problem

The original mass-timber scheme required 340 simultaneous deliveries during the steel phase. The port authority capped us at 90. Redesigning the erection sequence added eleven weeks to the bar-chart schedule and blew the GMP.

What we did

  • Re-sequenced erection into four zones with off-site staging on a leased apron.
  • Substituted CLT for the mezzanine only, keeping the primary frame in recycled steel.
  • Built the dock wall in two halves and switched the live operation across on a single weekend.
  • Traded schedule float back by compressing the envelope, not the fit-out.

The result

Handover nine days early, 1.4% under the revised GMP, and zero interruption to Cascadia's port operations across 22 months.

Delivered
9 days early
Budget
−1.4%
Area
312k sq ft
Variation
2.8%
Discuss a similar project

Client voice

Client testimonial

“They told us our own plan would not work, showed us the numbers, then built it a different way. Nobody else who bid was willing to say that out loud.”

Marcus Oyelaran

Director of Operations, Cascadia Grocers

Next project

Add yours to
the record.

Send the drawings or the napkin sketch. Two business days to a real number, from an estimator who will be on your project.